Commercial · Bar Planner
A 3 m counter, to scale
Add equipment and it lands on the bar at its published width and depth. Drag tiles along the counter. The meter adds up current against a typical 30 A circuit; the list prints for an electrician or a supplier.
Throughput
Rule of thumb 60 drinks a group an hour is a planning assumption, not a published figure: about one drink a minute from each group, kept up through the peak by one barista per group. Change it to suit your menu and your team. Where a machine's maker publishes its hourly output, the sizer uses that instead.
2 groups
suggested for the peak hour.
Add an espresso machine to check the bar against the peak.
Equipment list
| Equipment | Footprint | Current | Power | Voltage | Phase | Plumbing | |
|---|---|---|---|---|---|---|---|
| The list fills as you add equipment. | |||||||
Current comes from the maker's published amperage; where only power and voltage are published it is derived at the lowest published voltage (marked d), the worst case for the circuit. A 30 A circuit is a common North American branch circuit for a two-group machine; check the maker's installation guide and local code with a licensed electrician. Figures are each maker's own, read on the dates shown on the model pages.